Parent Layer:
Metropolitan Transportation Plan
Name: Existing and Committed Projects - Points
Display Field: TIP
Type: Feature Layer
Geometry Type: esriGeometryMultipoint
Description: The STIP is a multi-year capital improvement document which denotes the scheduling and funding of construction projects across the state over a minimum 4 year time period as required by Federal law. North Carolina’s STIP covers a 10 year period, with the first six years referred to as the delivery STIP and the latter four years as the developmental STIP. Per 23 CFR 450.216 & 23 U.S. Code § 135 STIP’s must also:Be submitted to Federal Highway Administration (FHWA) & Federal Transit Administration (FTA) for approval at least every 4 yearsBe fiscally constrained by yearInclude all capital and non-capital projects using Title 23 USC or Title 49 USC funds, other than certain safety, planning, and research fundsInclude metropolitan TIPs (Transportation Improvement Projects) from Metropolitan Planning OrganizationsProvide public comment opportunity on STIP documentAnd include the following information:Project description and terminiEstimated total cost (NCDOT includes Utility, R/W, and Construction costs)Federal funds to be obligatedResponsible agency (such as municipality)The STIP contains funding information and schedules for transportation modes and programs including: Highways, Aviation, Bicycle and Pedestrian, Ferry, Public Transportation, Rail, Governor’s Highway Safety and statewide related programs.The transportation program in the STIP is organized by the 14 transportation divisions. Each Division section includes a funding source reference table and is divided between highway and non-highway project schedules. Projects are also listed by county within each division. This results in some duplication since transportation projects frequently extend across county and division lines. When this duplication occurs, a project is listed in each county in which it is found.Projects are further subdivided by category: interstate, rural, urban, bridge, municipal bridge, bicycle and pedestrian, congestion mitigation, highway safety improvement program, ferry, passenger rail, and roadside environmental. Interstate, rural, urban, bridge, and ferry projects are described by route number. Municipal bridge, bike and pedestrian projects are listed by city or county. Congestion mitigation and passenger rail projects are listed alphabetically by city or county. Highway safety improvement program projects may be listed by route, city, or county. The Public Transportation program list projects first by the transportation partners and providers then by identification numbers.Projects are also listed by the STI category they are funded from, i.e., by Statewide Mobility, Regional Impact, or Division Needs. The phases of projects (such as Right of Way (R), Utility relocation (U), and Construction (C) are listed by Fiscal Year along with their costs and anticipated funding sources. All projects require extensive planning, environmental impact and design studies. The location and exact type of improvements are subject to refinement and modification during the planning and design phases.North Carolina’s STIP is updated every two years and developed in concert with federal and state revenue forecasts, North Carolina Department of Transportation’s (NCDOT’s) Strategic Prioritization process, preconstruction and project development timetables, and in adherence with federal and state laws. North Carolina state law requires Board of Transportation (BOT) action to approve the STIP.For complete information: https://connect.ncdot.gov/projects/planning/STIPDocuments1/NCDOT%20Current%20STIP.pdf
Service Item Id: 1944f38758ed42a39b74d632b062b034
Copyright Text: NC Department of Transportation, State Transportation Improvement Program (STIP) Unit. Support and maintenance of the spatial database where this data resides is handled by the North Carolina Department of Transportation. Support and maintenance of the enterprise spatial database where this data resides is handled by NCDIT's Transportation GIS Unit.
Default Visibility: true
MaxRecordCount: 2000
MaxSelectionCount: 2000
Supported Query Formats: JSON, geoJSON, PBF
Min Scale: 0.0
Max Scale: 0.0
Supports Advanced Queries: true
Supports Statistics: true
Has Labels: false
Can Modify Layer: true
Can Scale Symbols: false
Use Standardized Queries: true
Supports Datum Transformation: true
Extent:
XMin: 1689634.7205423058
YMin: 785191.3793939991
XMax: 1722294.5771760186
YMax: 800831.5123290647
Spatial Reference: 102719
(2264)
LatestVCSWkid(0)
Drawing Info:
Renderer:
Simple Renderer:
Symbol: Style: esriSMSCircle
Color: [255, 0, 0, 255]
Size: 7.0
Angle: 0.0
XOffset: 0
YOffset: 0
Outline:
Label: N/A
Description: N/A
Transparency: 0
Labeling Info:
Feature Draw Order:
Advanced Query Capabilities:
Supports Statistics: true
Supports OrderBy: true
Supports Distinct: true
Supports Pagination: true
Supports TrueCurve: true
Supports Returning Query Extent: true
Supports Query With Distance: true
Supports Sql Expression: true
Supports Query With ResultType: false
Supports Returning Geometry Centroid: false
Supports Binning LOD: false
Supports Query With LOD Spatial Reference: false
Supports Percentile Statistics: true
Supports Having Clause: true
Supports Count Distinct: true
Supports Time Relation: true
Supports Sql Format: false
Supports Query Analytic: true
Supports Query With Current User: true
HasZ: true
HasM: true
Has Attachments: false
HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText
Type ID Field: null
Fields:
-
OBJECTID
(
type: esriFieldTypeOID, alias: OBJECTID
)
-
KH_ID
(
type: esriFieldTypeDouble, alias: KH_ID
)
-
TIP
(
type: esriFieldTypeString, alias: TIP, length: 255
)
-
Shape
(
type: esriFieldTypeGeometry, alias: Shape
)
Supported Operations:
Query
Query Attachments
Query Analytic
Generate Renderer
Return Updates
Iteminfo
Thumbnail
Metadata